Expansion and Modernization of the LPG Storage Plant. Construction and commissioning of a semi-refrigerated sphere of 9100 m3. Adequacy of the Fire Fighting System and Up Grade of the Instrumentation and Control system.
-
Preparation of the Integrity and Adequacy Plan to the DS 081-2007 for the gathering/injection and transportation Oil & Gas pipelines both Offshore and Onshore on the Block Z2B.
-
Installation of Permanent Production Facilities (7.0 MBOPD) on CX-11 offshore platform at the Corvina Field, including gas and water injection facilities, Fire Protection and SCADA.
-
Involved on the design, construction and commissioning of a 50 MMSCFD Cryogenic an EPCM “grass root plant” project installed on block Z2B.
-
Design, construction and commissioning a network of offshore/onshore pipelines for gas gathering, transport and injection pipelines including its compression units, measurement facilities and SCADA system.
-
Developing FEED and procedures for the construction and installation of offshore pipelines (6” & 3” diameter) including Risk Analysis evaluation and providing the project management.
-
Developing a Risk Based inspection program for the production facilities and process equipment on the gas processing plant. Technical support for performing on-line inspection with contractors.
-
Elaboration of plans, provide management and supervision of processing plant shutdown and start up for the scheduled maintenance purpose.